Our professional skate ramp construction team can assemble your half pipe in no time. 

Lead times can vary from 1-4 weeks depending upon availability. 

Installations are available within 500km from Gold Coast QLD.

Delivery charges are calculated based on distance from our factory.  

What do you need to consider before booking an installation? 

Do you have enough space? Our halfpipes come in different sizes. Refer to product description for detailed dimensions. You should have a minimum of 300mm extra space surrounding your halfpipe.

Is the area for your halfpipe level and solid? In most cases your halfpipe kit can be installed on lawn or gravel road base using simple 300*300*40mm concrete pavers. Pavers are provided by the client beforehand. If the area is sloped, you might need a ramp platform built for extra fee.

Do you require any add-ons? We can offer a range of different extensions and add-ons for your halfpipe. These include roll-ins, wider platforms, handrails, extensions, spines. All custom ideas are welcome.

Email us at info@koramps.com.au for a personalised quote. Include your name, contact number, address, indoor/outdoor half pipe, size and any extras you might require.